Natural Gas Mainline River Pigging Station
![](https://www.strikegroup.ca/wp-content/uploads/2024/04/Cover-300x225.jpg)
Project Locations:
- Northwest Alberta
Strike Divisions:
- Field Services
Project Overview:
Install launcher and receiver on Natural Gas Mainline Pipeline Crossing on the Peace River
Scope:
- Excavate an existing pipeline on either side of the Peace River
- Install new pig launcher and receiver for pipeline inspections
- Complete a pigging station and restore pipeline ROW to original condition for landowner