HSE Resource Library

HSEMS Section 01 – Health, Safety and Environment
HSEMS Section 02 – Hazard Identification, Assessment and Control
HSEMS Section 05 – General Rules
HSEMS Section 06 – Personal Protective Equipment
HSEMS Section 07 – Preventative Maintenance
HSEMS Section 08 – Training and Communication
HSEMS Section 09 – Inspection, Evaluations, Audits & Observations
HSEMS Section 10 – Incident Management, Investigation & Follow-Up
HSEMS Section 11 – Emergency Preparedness & Response
HSEMS Section 12 – Statistics & Records
HSEMS Section 13 – Alcohol & Drugs
HSEMS Section 14 – Discrimination, Violence & Harassment
HSEMS Section 15 – Environment
HSEMS Section 16 – Working Alone
HSEMS Section 17 – Claims Management
HSEMS Section 18 – Subcontractor Management
HSEMS Section 19 – Glossary Terms & Definitions
HSEMS Section 20 – Safety Alerts & Bulletin
HSEMS Section 21 – Fleet Safety and Journey Management
COP 01 – Hydrogen Sulphide
COP 02 – Respiratory Protective Equipment
COP 03 – Confined Space Entry
COP 04 – Noise Control and Hearing Conservation
COP 05 – Lock Out – Tag Out
COP 06 – Fall Protection
COP 07 – Ground Disturbance
COP 08 – Benzene
COP 09 – Safe Work Permit System
SWP 01 – ATV Safety
SWP 02 – Backfilling
SWP 03 – Blinding/ Blanking
SWP 04 – Cargo Securement and Trailer Use
SWP 05 – Fire Extinguishers – Portable (Use/Inspection/Maintenance)
SWP 06 – Working in Cold (Wind Chill Factor)
SWP 07 – Distracted Driving
SWP 08 – Office Safety
SWP 09 – Traffic Control
SWP 11 – Compressed Air
SWP 12 – Compressed and Liquefied Gas
SWP 13 – Chain Saw Operation
SWP 14 – Wildlife Awareness
SWP 15 – Radiation
SWP 16 – Asbestos
SWP 17 – Chemical Hazards, Biological Hazards and Harmful Substances
SWP 18 – Tools / Equipment / Machinery
SWP 19 – Housekeeping
SWP 21 – Working Alone
SWP 22 – Ergonomics – Manual Material Handling
SWP 23 – Fatigue Management
SWP 24 – Overhead Power Lines (Working Near)
SWP 25 – Ladders
SWP 26 – Grinder Operations
SWP 28 – Driving & Journey Management
SWP 29 – Loading / Hauling / Unloading Equipment
SWP 31 – Fueling
SWP 33 – Hazardous Materials / Products / Substances
SWP 34 – Cranes Hoists and Lifting Devices
SWP 35 – Propane Cylinders and Torches (Use, Care, Handling)
SWP 36 – Monitoring for the Escape of Hydrocarbons
SWP 37 – Change Management
SWP 38 – Arc Flash
SWP 39 – Stringing Pipe (With Hooks and Calipers)
SWP 40 – Stringing Pipe (With Wheels and Chute)
SWP 41 – Critical Hoisting
SWP 42 – Mechanical Vibration Equipment / Tools
SWP 43 – Welding, Cutting and Allied Processes
SWP 44 – Mechanical Mobile Equipment Operations
SWP 45 – Operating Facilities (Working Near)
SWP 46 – Excavations / Trenches
SWP 47 – Dangerous Goods
SWP 48 – Pipe Handling
SWP 49 – Pipeline Welding
SWP 50 – Equipment Maintenance
SWP 51 – Fabrication
SWP 52 – Working on Hills/Slopes
SWP 54 – Rigging
SWP 55 – Setting 1000bb1 Tanks
SWP 56 – Scaffolds and Temporary Platforms
SWP 57 – Workplace OHS Committees
SWP 58 – Fire and Explosion
SWP 59 – Influenza A / H1N1
SWP 61 – Electrical
SWP 63 – Demolition
SWP 64 – Blood Borne Pathogens
SWP 65 – Forestry / Logging Operations
SWP 66 – Lightning
SWP 67 – Lead
SWP 68 – Working in Heat
SWP 70 – Mats/Matting
SWP 71 – Chucks, Positioners and Power Rollers
SWP 72 – Iron Sulphide
SWP 73 – NORM (Naturally Occuring Radioative Material)
SWP 74 – Wrench Use
SWP 75 – Vehicle and Equipment Spotting
SWP 76 – Safe Knife Use
SWP 77 – Pump Jacks
SWP 78 – Abrasive Blasting
SWP 79 – COVID-19 Coronavirus
SWP 80 – Use of Face Coverings: COVID 19
SWP 81 – Cribbing & Pipe Cones
SWP 82 – Trench Boxes
SWP 83 – Hydraulic Torque Wrench Use
SWP 84 – Pipe Coating
SWP 85 – Dropped Object Hazard Management
SWP 86 – Brush Pile Burning
SWP 87 – Working on Ice Covers
SWP 88 – Fired and Flameless Heaters
SWP 89 – Using Jacks and Stands
SWP 90 – Hantavirus
SJP 01 – Batteries (Boosting)
SJP 02 – Lowering In (Pipeline)
SJP 03 – Jeeping / Holiday Detection (Pipeline)
SJP 04 – Purging with Nitrogen
SJP 05 – Pile Installation (With Excavator)
SJP 06 – Pipe Bending
SJP 06A – Pipe Bending Mechanical
SJP 07 – Cold Cutting Existing Pipe
SJP 08 – Hot Tapping
SJP 09 – Pressure Testing – Hydrostatic
SJP 10 – Pressure Testing – Pneumatic
SJP 11 – Pigging and Soap Testing
SJP 12 – Fiberglass Pipe and Fittings (Handling/Installation/Inspection)
SJP 13 – Stringing Pipe
SJP 14 – Loading Side Boom and Boom Stick
SJP 15 – Removing Blade from Dozer
SJP 16 – Installing Blade onto D6
SJP 17 – Removing Boom Stick
SJP 18 – Loading the D6
SJP 19 – Towing
SJP 20 – Using Non-Intrinsically Safe Tools
SJP 21 – Threading Pipe
SJP 23 – Forklift Operator
SJP 24 – Removing Piles
SJP 25 – Tie-in to Existing Piping System
SJP 26 – Running Inhibitors through lines
SJP 27 – Joint Protection / Sleeving
SJP 28 – ROW Preparation
SJP 29 – Tie-In welding (pipeline)
SJP 30 – Excavating and or Trenching
SJP 31 – Pipeline Welding
SJP 33 – Building Entry
SJP 34 – Exothermic Bonding
SJP 35 – Pipeline Set-in (Above Ground)
SJP 36 – Stringing Pipe (Above Ground)
SJP 37 – Pipeline Coating Removal
SJP 38 – Setting Up Wood Frame Hoarding
SJP 39 – Excavating Around Operating Pipelines
SJP 40 – Use of Digging Spoon in Proximity to Pipeline
SJP 41 – Staging Large Valves and Components
SJP-EI-01 Battery Boosting
SJP-EI-02 Building Entry Procedure
SJP-EI-03 Forklift Operator
SJP-EI-04 Towing
SJP-EI-05 Using Non-Intrinsically Safe Tools
SJP-EI-06 Installing Cable Tray
SJP-EI-07 Installing Yard Light
SJP-EI-08 Pulling Teck Cable into Cable Tray
SJP-EI-09 Pulling Wire in Conduit
SJP-EI-10 Stripping and Cutting Teck Cable
SJP-EI-11 Installing Mineral Insulated Heat Trace
SJP-EI-12 Installing Self Regulating Heat Trace
SJP-EI-13 Equipment Installation
SJP-EI-14 Excavating and Trenching
SJP-EI-15 Cable Demolition
SJP-EI-16 Raceway, Stands and Supports
SJP-EI-17 Instrument Calibrations
SJP-EI-18 Instrument Installation
SJP-EI-19 Tubing and Fittings Installation
SJP-EI-20 Gland and Terminate Cable into Live Distribution Panel Up to 600V
HSEMS Section 01 – Health, Safety and Environment
HSEMS Section 02 – Hazard Identification, Assessment and Control
HSEMS Section 03 – Safe Work Practices
HSEMS Section 04 – Safe Job Procedures
HSEMS Section 05 – General Rules
HSEMS Section 06 – Personal Protective Equipment
HSEMS Section 07 – Preventative Maintenance
HSEMS Section 08 – Training and Communication
HSEMS Section 09 – Inspection, Evaluations, Audits & Observations
HSEMS Section 10 – Incident Management, Investigation & Follow-Up
HSEMS Section 11 – Emergency Preparedness & Response
HSEMS Section 12 – Statistics & Records
HSEMS Section 14 – Discrimination, Violence & Harassment
HSEMS Section 15 – Environment
HSEMS Section 16 – Working Alone
HSEMS Section 17 – Claims Management
HSEMS Section 18 – Subcontractor Management
HSEMS Section 19 – Glossary Terms & Definitions
HSEMS Section 20 – Safety Alerts & Bulletin
HSEMS Section 21 – Fleet Safety and Journey Management
* Code of Practice TOC
COP 01 Hydrogen Sulphide
COP 02 Respiratory Protective Equipment
COP 03 Confined Space Entry
COP 04 Noise Control and Hearing Conservation
COP 05 Lock-Out-Tag-Out
COP 06 Fall Protection
COP 07 Ground Disturbance
COP 08 Benzene
COP 09 Safe Work Permit System
* Safe Work Manual TOC
SWP 01 ATV & UTV
SWP 02 Backfilling
SWP 03 Blinding / Blanking
SWP 04 Cargo Securement and Trailer Use
SWP 05 Fire Extinguishers – Portable (Use/Inspection/Maintenance)
SWP 06 Working in Cold (Wind Chill Factor)
SWP 07 Distracted Driving
SWP 08 Office Safety
SWP 09 Traffic Control
SWP 11 Compressed Air
SWP 12 Compressed and Liquefied Gas
SWP 13 Chain Saw Operation
SWP 14 Wildlife Awareness
SWP 15 Radiation
SWP 16 Asbestos
SWP 17 Chemical, Biological Hazards and Harmful Substances
SWP 18 Tools / Equipment / Machinery
SWP 19 Housekeeping
SWP 21 Working Alone
SWP 22 Ergonomics – Manual Material Handling
SWP 23 Fatigue Management
SWP 24 Overhead Power Lines (Working Near)
SWP 25 Ladders
SWP 26 Grinder Operations
SWP 28 Driving and Journey Management
SWP 29 Loading / Hauling / Unloading Equipment
SWP 31 Fueling
SWP 33 Hazardous Materials / Products / Substances
SWP 34 Cranes Hoists and Lifting Devices
SWP 35 Propane Cylinders and Torches (Use, Care, Handling)
SWP 36 Monitoring for the Escape of Hydrocarbons
SWP 37 Change Management
SWP 38 Arc Flash
SWP 39 Stringing Pipe (With Hooks and Calipers)
SWP 40 Stringing Pipe (With Wheels and Chute)
SWP 41 Critical Hoisting
SWP 42 Mechanical Vibration Equipment / Tools
SWP 43 Welding, Cutting and Allied Processes
SWP 44 Mechanical Mobile Equipment Operations
SWP 45 Operating Facilities (Working Near)
SWP 46 Excavations / Trenching
SWP 47 Dangerous Goods
SWP 48 Pipe Handling
SWP 49 Pipeline Welding
SWP 50 Equipment Maintenance
SWP 51 Fabrication
SWP 52 Working on Hills / Slopes
SWP 54 Rigging
SWP 55 Setting 1000bb1 Tanks
SWP 56 Scaffolds and Temporary Platforms
SWP 57 Workplace OHS Committees
SWP 58 Fire and Explosion
SWP 59 Influenza A / H1N1
SWP 61 Electrical
SWP 63 Demolition
SWP 64 Blood Borne Pathogens
SWP 65 Forestry / Logging Operations
SWP 66 Lightning
SWP 67 Lead
SWP 68 Working in Heat
SWP 70 Mats / Matting
SWP 71 Chucks, Positioners and Power Rollers
SWP 72 Iron Sulphide
SWP 73 NORM (Naturally Occurring Radioactive Material)
SWP 74 Wrench Use
SWP 75 Vehicle and Equipment Spotting
SWP 76 Safe Knife Use
SWP 77 Pump Jacks
SWP 78 Abrasive Blasting
SWP 79 COVID-19 Coronavirus
SWP 80 Use of Face Coverings: COVID 19
SWP 81 Cribbing & Pipe Cones
SWP 82 Trench Boxes
SWP 83 Hydraulic Torque Wrench Use
SWP 84 Pipe Coating
SWP 85 Dropped Object Hazard Management
SWP 86 Brush Pile Burning
SWP 87 Working On Ice
SWP 88 Fired and Flameless Heaters
SWP 89 Using Jacks and Stands
SWP 90 Hantavirus
* Safe Job Procedures TOC
SJP 01 Batteries (Boosting)
SJP 02 Lowering In (Pipeline)
SJP 03 Jeeping / Holiday Detection (Pipeline)
SJP 04 Purging With Nitrogen
SJP 05 Pile Installation With Excavator
SJP 06 Pipe Bending
SJP 07 Cold Cutting Existing Pipe
SJP 08 Hot Tapping
SJP 09 Pressure Testing – Hydrostatic
SJP 10 Pressure Testing – Pneumatic
SJP 11 Pigging and Soap Testing
SJP 12 Fibreglass Pipe and Fittings (Handling/Installing/Inspection)
SJP 13 Stringing Pipe
SJP 14 Loading Side Boom and Boom Stick
SJP 15 Removing Blade from Dozer
SJP 16 Installing Blade onto D6
SJP 17 Removing Boom Stick
SJP 18 Loading D6
SJP 19 Towing
SJP 20 Using Non-Intrinsically Safe Tools
SJP 21 Threading Pipe
SJP 23 Forklift Operator
SJP 24 Removing Piles
SJP 25 Tie in to Existing Pipe System
SJP 26 Running Inhibitors Through Lines
SJP 27 Joint Protection / Sleeving
SJP 28 ROW Preparation
SJP 29 Tie-In Welding
SJP 30 Excavating and or Trenching
SJP 31 Pipeline Welding
SJP 33 Building Entry Procedure
SJP 34 Exothermic Bonding
SJP 35 Pipeline Set-in (Above Ground)
SJP 36 Stringing Pipe (Above Ground)
SJP 37 Pipeline Coating Removal
SJP 38 Setting up Wood Frame Hoarding
SJP 39 Excavating around Operating Pipelines
SJP 40 Use of Digging Spoon in Proximity to Pipeline
SJP 41 Staging Large Valves and Components
Safety Ambassador Program
Nominate an Employee: Safety Ambassador Nomination Form
Do you work with someone that goes out of their way to make the workplace safer for everyone? Strike Group wants to recognize deserving health and safety leaders throughout our company who make a difference in their workplace or community. Anyone can be a Safety Ambassador for our company!
Safety Ambassador’s for Strike Group are people that:
- Complete their work in a manner that helps to protect the safety of themselves and their co-workers.
- Never compromise on safety.
- Provide mentorship to new workers.
- Help to identify, assess, and manage the hazards of their work.
- Go above and beyond to help make Strike Group sites safer for everyone.
- Are team players who help make Strike Group a great and safe place to work.