Project Overview

Terminal Capacity of 140,000 to 172,000 bpd

The mechanical scope of work was comprised of:

  • 50,000 man hours 14,782 linear feet of 8”pipe average NPS;
  • Installation of new crude oil processing piping system;
  • Crude oil sampling system;
  • Crude oil vapour collection and destruction system;
  • Compressed air system for controls;
  • Instrument air, and air tools;
  • Hot water system for showers, eyewashes and wash down water;
  • Oil Water separators; and
  • Loading Rack Terminal Building ventilation system for 31 railcar crude loading facility.

The electrical scope of work was comprised of:

  • Electrical room main power distribution;
  • Three power distribution switchracks;
  • Three i/o cabinets inside the Loading Rack Terminal Building;
  • One i/o cabinet at the strainer area;
  • One PLC cabinet in the electrical room;
  • VCU control panels in the electrical room; and
  • Instrument wiring, heat grounding an automation system.